Assembly Guide
Sterling O'Brien
0 comments
→ Download the Installation Guide
-
Position the base in the desired location.
-
Gently place the Doggy Bathroom inside the base.
-
If you plan to use the vertical pee pads, follow these instructions to snap the rails into place:
- Stand over the Doggy Bathroom.
- Position one rail over the edge of the Doggy Bathroom.
- Place the palm of your hand over the rail.
- Press down firmly over the front, then the back, and finally the center of the rail until you feel and hear a snap.
- Repeat on both sides.
- To remove the rails, place both hands on the rail and firmly peel back.
-
Line the bottom with one pee pad. If you are using Doggy Bathroom pee pads, you don't need to peel back the adhesive strip for the bottom pee pad.
-
For leg lifters: remove the paper from the adhesive strip and affix or clip one pee pad onto each rail.
-
Place the mat in front of the opening.
-
Et voilà!