Assembly Guide

Sterling O'Brien
0 comments
Assembly Guide Assembly Guide

→ Download the Installation Guide

 

  1. Position the base in the desired location.

  2. Gently place the Doggy Bathroom inside the base.

  3. If you plan to use the vertical pee pads, follow these instructions to snap the rails into place:

    • Stand over the Doggy Bathroom.
    • Position one rail over the edge of the Doggy Bathroom.
    • Place the palm of your hand over the rail.
    • Press down firmly over the front, then the back, and finally the center of the rail until you feel and hear a snap.
    • Repeat on both sides.
    • To remove the rails, place both hands on the rail and firmly peel back.
  4. Line the bottom with one pee pad. If you are using Doggy Bathroom pee pads, you don't need to peel back the adhesive strip for the bottom pee pad.

  5. For leg lifters: remove the paper from the adhesive strip and affix or clip one pee pad onto each rail.

  6. Place the mat in front of the opening.

  7. Et voilà!